The expansion of the Canpotex Marine Terminal 5 in Portland, Oregon, enlarged the facility’s capacity to process and ship white potash to overseas markets. Initially, a membrane solution was specified to protect the concrete piers, tunnel and building foundations. However, the project owners opted for an integral solution, thanks, in part, to many contractors who said they saved time and reduced construction costs when switching from a traditional surface applied waterproofing to a Penetron crystalline solution for projects located in a marine environment. Penetron worked with Cal Portland to design an optimal concrete mix that met the demands of the marine environment. PENETRON ADMIX was used to waterproof all new concrete. PENETRON slurry and PENECRETE MORTAR were applied to the tie holes and to patch previous honeycombing and defects.
The Dalí Museum in St. Petersburg, Florida, is home to the largest collection of Salvador Dalí’s artwork outside Spain and was recently placed on the list of the “20 Mos ... Read more
The South Cobb Tunnel Lift Station in Austell, Georgia, was the largest expansion project and deepest tunnel construction undertaken by the Cobb County Water Authority (CCWS), ... Read more
To keep a live tiger mascot happy at Louisiana State University (LSU), you need a substantial water area (including a large pond and waterfall for hot weather), an enormous sy ... Read more
San Diego’s Metropolitan Transportation Service (MTS) new, high-efficiency wheel truing pit keeps MTS rail cars rolling smoothly. When the general contractor began construct ... Read more
The expansion of the Oyster Creek propylene production facility in Freeport, Texas, was a key part of Dow Chemical’s multi-billion-dollar investment (Gulfstream) program to ... Read more
Modera Coral Gables is a 237-unit luxury apartment mid-rise building in Miami, Florida, located on an urban infill area and only one block south of Coral Gables’ Miracle Mil ... Read more