Project goal is to remove a small section of bench and creating a final wall catch bench without disturbing neighboring homes within 750 feet of blast area. Read more
An application to determine how various blast patterns proposed for a project would perform in the field. Read more
A fragmentation model developed in-house by Dyno Nobel was employed to model the fragmentation that would result from changes in the various blast design parameters. Read more
The use of SHA (Signature Hole Analysis) and electronic detonators allowed the mine to dial in optimum timing sequences regardless of the number of holes per delay, resulting ... Read more
As a new mine starting up development, this gold mine in Northern Ontario used much of the blasted rock for infrastructure in building up roads and construction pads. Read more
Using Differential Energy, Dyno Nobel was able to reduce the number of boulders at a quarry without adding more blast holes. Read more